The University Projects Under The EEP Have Been Developed Sustainably In Phases.
EEP Phase 1 Universities Shown Below
- Abubakar Tafawa Balewa University Teaching Hospital
- BAYERO UNIVERSITY, KANO
- UNIVERSITY OF AGRICULTURE, MAKURDI, BENUE STATE
- FEDERAL UNIVERSITY OF PETROLEUM RESOURCES EFFURUN, DELTA STATE
- FEDERAL UNIVERSITY NDUFU – ALIKE, IKWO, EBONYI STATE
- NNAMDI AZIKIWE UNIVERSITY, AWKA, ANAMBRA STATE
- OBAFEMI AWOLOWO UNIVERSITY AND TEACHING HOSPITAL, ILE-IFE, OSUN STATE
- UNIVERSITY OF LAGOS, LAGOS STATE
- USMANU DANFODIYO UNIVERSITY, SOKOTO STATE
- OVERALL PROGRESS & NEXT STEPS
- DOCUMENT REVIEWS & APPROVALS
ABUBAKAR TAFAWA BALEWA UNIVERSITY TEACHING HOSPITAL, BAUCHI.
REGION: NORTH EAST
Abubakar Tafawa Balewa (ATBU) University was founded in 1980. The Gubi campus is being powered by the Energizing Education Programme. The University occupies 170 hectares of land. The total population of the University for Undergraduate, Post graduate, Academic and Non academic staffs as at July 2016 was 18,284
|
TECHNICAL BREAKDOWN
LOT
|
TECHNNOLOGY
|
CONTRACTOR
|
9
|
Solar Hybrid
|
Sterling & Wilson Nigeria Limited
|
PROGRESS REPORT
1. Site clearing has been completed. 2. Topographical survey and geotechnical investigation reports have been submitted and approved by REA. 3. Site fencing has been completed 4. Site office portacabins have been deployed to site, security personnel for site security purposes have also been deployed |
PROGRESS GALLERY
We cannot display this gallery |
BAYERO UNIVERSITY, KANO.
REGION: NORTH EAST
Bayero University Kano was founded in 1975. The University’s governing bodies are the University Council and the Senate. The university was initially named Bayero University College before being upgraded to Bayero University. As at July 2016, the total population of the University for both Undergraduate, Post graduate, Academic and Non-academic staff, as at July 2016 was 31,462. Bayero University is located in Kano, The main campus is being powered by the Energizing Education Programme. It is situated on a 1,369 hectares located along the Gwarzo Road, Kano. |
TECHNICAL BREAKDOWN
LOT
|
TECHNNOLOGY
|
CONTRACTOR
|
7 | Solar Hybrid | Metka West Africa Limited |
PROGRESS REPORT
1. Site clearing and levelling has been completed.
2. Topographical survey and geographical investigations have been conducted and the report has been submitted and approved by REA 3. Fencing works has been completed. 4. Procurement for equipment has been done and awaiting shipping as site is on a fast- track. 5. Factory acceptance test for diesel generators has been completed 6. Internal road preparation on-going |
PROGRESS GALLERY
We cannot display this gallery |
UNIVERSITY OF AGRICULTURE, MAKURDI, BENUE STATE
REGION: NORTH CENTRAL
The University of Agriculture, Makurdi came into effect from January 1988. The University’s governing bodies are the University Council and the Senate. The University campus comprises of the North core, Middle core and South core. The University of Agriculture, Makurdi is situated on 8,000 hectares with coordinates 7°47’29.1″N 8°37’15.7”E. It is located on the Makurdi – Lafia road in Makurdi, the capital of Benue State, in North-Central Nigeria, about 300 Kilometers to the southeast of Abuja, Nigeria’s Federal Capital. The Campus is located north of the River Benue, near the township of Makurdi North. As at July 2016, the combined population of both students and staff on campus was 17,864. |
TECHNICAL BREAKDOWN
LOT
|
TECHNNOLOGY
|
CONTRACTOR
|
8 | Solar Hybrid | Sterling & Wilson Nigeria Limited |
PROGRESS REPORT
1. Site clearing has been completed. 2. Topographical survey and geotechnical investigations reports have submitted and approved by REA 3. Site fencing is 50% completed 4. Site office portacabins have been deployed to site, security personnel for site security purposes have also been deployed |
PROGRESS GALLERY
We cannot display this gallery |
FEDERAL UNIVERSITY OF PETROLEUM RESOURCES EFFURUN, DELTA STATE
REGION: SOUTH SOUTH
The Federal University of Petroleum Resources Effurun was founded in 2007. The University’s governing bodies are the University Council and the Senate. In January 2006, the Federal Government approved the takeoff of the college of petroleum and gas engineering of the University of Benin at Effurun, near Warri in Delta Sate. It was later upgraded to a full-fledged university in the year 2007. The University is located at Ugbomro, Uvwie Local Government Area, along warri-Port Harcourt Road, before Agbarho Bridge. The University Campus covers 163,151 hectares of land with coordinates 5°34’21.9″N 5°50’29.8″E. The campus is not as swampy as the other parts of Warri areas. As at July 2016, the population of the University for undergraduate and members of staff totaled 4,000. |
TECHNICAL BREAKDOWN
LOT
|
TECHNNOLOGY
|
CONTRACTOR
|
5 | Solar Hybrid | Metka West Africa Limited |
PROGRESS REPORT
1. Surveys and Soil investigations have been conducted and the report has been submitted and approved by REA. 2. Site clearing and fencing has been completed 3. Civil works for internal road is ongoing alongside other site features 4. Factory acceptance test for diesel generators has been completed |
PROGRESS GALLERY
We cannot display this gallery |
FEDERAL UNIVERSITY NDUFU – ALIKE, IKWO, EBONYI STATE
REGION: SOUTH EAST
Federal University Ndufu-Alike Ikwo is a modern University established in 2011 and is located in the serene agricultural environment of Ikwo in Ebonyi State, South East Geopolitical zone of Nigeria. Fondly called FUNAI, the University prides itself as the Home of Soaring Eagles, after its totem bird, the eagle, whose soaring image is prominent on the University logo. In 2011 the University initially took over the facilities of Government girls college Ndufu – Alike. After the take over, the University acquired additional land space to create the permanent site in its present form. The main campus of The Federal University, Ndufu-Alike Ikwo (FUNAI) is situated on 435.72 hectares with coordinates 6°08’10.2″N 8°08’46.8″E, and is located along the Major road to IKWO. The University began operations with only a takeoff site but soon expanded to a permanent site. The permanent site is an extension of the takeoff site with the two campuses within the same location being powered by the Energizing Education Programme. The University administrative staff are currently operating from the permanent site and the female students are currently living in the hostels situated at the permanent site. As at July 2016, the combined population of both students and staff on campus was 3,590 |
TECHNICAL BREAKDOWN
LOT
|
TECHNNOLOGY
|
CONTRACTOR
|
4 | Solar Hybrid | Sterling & Wilson Nigeria Limited |
PROGRESS REPORT
1. Site clearing has been completed with internal access road 50% complete 2. Topographical survey and geotechnical investigations has been submitted and approved by REA. 3. Project Site Office has been positioned to Site 4. Fencing activities has been completed. 5. Street lighting materials have been delivered to site |
PROGRESS GALLERY
We cannot display this gallery |
NNAMDI AZIKIWE UNIVERSITY, AWKA, ANAMBRA STATE
REGION: SOUTH EAST
|
TECHNICAL BREAKDOWN
LOT
|
TECHNNOLOGY
|
CONTRACTOR
|
3 | Solar Hybrid | Metka West Africa Limited |
PROGRESS REPORT
1. Site clearing activities and have been completed and levelling ongoing due to soil conditions and bad weather 2. Site office caravan has been deployed to site 3. Topographical survey and geotechnical investigation report has been submitted and approved by REA 4. Fencing activities are ongoing 5. Factory acceptance test for diesel generators has been completed |
PROGRESS GALLERY
We cannot display this gallery |
OBAFEMI AWOLOWO UNIVERSITY AND TEACHING HOSPITAL, ILE-IFE, OSUN STATE
REGION: SOUTH WEST
|
TECHNICAL BREAKDOWN
LOT
|
TECHNNOLOGY
|
CONTRACTOR
|
1 | Gas-Fired Power Plant | Sterling & Wilson Nigeria Limited |
PROGRESS REPORT
1. Site office caravan has been positioned on site 2. Site clearing and levelling activities has been completed 3. Geotechnical investigation has been submitted and approved by REA 4. Fencing works has reached 50% completion |
PROGRESS GALLERY
We cannot display this gallery |
UNIVERSITY OF LAGOS, LAGOS STATE
REGION: SOUTH WEST
|
TECHNICAL BREAKDOWN
LOT
|
TECHNNOLOGY
|
CONTRACTOR
|
2 | Gas-Fired Power Plant | Sterling & Wilson Nigeria Limited |
PROGRESS REPORT
1. Site office caravan has been re-positioned inside the site boundary. 2. Site clearing activities have been completed 3. Cable relocation has been completed 4. Soil investigation has been completed and report submitted for REA’s approval 5. 30% of the detailed design drawings have been approved for the contractor to commence work |
PROGRESS GALLERY
We cannot display this gallery |
USMANU DANFODIYO UNIVERSITY, SOKOTO STATE
REGION: NORTH WEST
|
TECHNICAL BREAKDOWN
LOT
|
TECHNNOLOGY
|
CONTRACTOR
|
6 | Solar Hybrid | Metka West Africa Limited |
PROGRESS REPORT
1. Site clearing fencing has been completed. 2. Topographical survey and geotechnical investigation reports have been submitted and approved by REA 3. Final vendors for major equipment have been determined by the Contractor and a Purchase Order has been sent for the some of the equipment such as the batteries and the inverter system. 4. Equipment foundation has commenced. 5. Factory acceptance test for diesel generators has been completed |
PROGRESS GALLERY
We cannot display this gallery |
PROGRESS TO DATE
|
KEY STEP OVER ONE MONTH
|
|
TECHNICAL | ||
|
|
|
FINANCIAL | ||
|
||
LEGAL & REGULATORY | ||
|
PROJECT DOCUMENTS REVIEW AND APPROVALS REPORTS |
||||||
EPCC | METKA | |||||
S/N | DOCUMENTS SUBMITTED TO DATE | DATE IN | DATE OUT | DEADLINE | STATUS | REMARKS |
1 | NG UNIVERSITIES – DOCUMENT SUBMISSION D-0023 – FOUNDATION DRAWINGS & STRUCTURAL REPORTS – BUK (Α-4513) |
9/11/18 & 16/11/18 |
15/11/18 19/11/18 22/11/18 |
Before cob – Wednesday 21st November | PROVISIONALLY APPROVAL | EPCC to attend to the issues raised and re-submit for final approval. |
2 | NG UNIVERSITIES – DOCUMENT SUBMISSION D-0021 – Foundations Structural Report (Α-4515) | 16/11/18 | 19/11/18 | Before cob – Wednesday 21st November | PROVISIONALLY APPROVAL | EPCC to attend to the issues raised and re-submit for final approval |
3 | NG UNIVERSITIES – DOCUMENT SUBMISSION D-0029 – ROADS STUDIES & DRAWINGS (Α-4697) | 23/11/18 | 24/11/18 | APPROVED | .EPCC given certain corrections & to submit stamped, signed and sealed hard-copies for documentation. | |
4 | NG UNIVERSITIES – DOCUMENT SUBMISSION D-0028 – WORKSHOP / TRAINING CENTRE STRUCTURAL DRAWINGS & REPORTS – UDUS & AWKA (Α-4606) | 21/11/18 | 24/11/18 | APPROVED | EPCC to submit the hardcopies for documentation and the revised Architectural Drawings for final approval. | |
5 | NG UNIVERSITIES – DOCUMENT SUBMISSION D-0025 – FOUNDATION DRAWINGS & STRUCTURAL REPORTS – AWKA (Α-4566) |
14/11/18 16/11/18 |
16/11/18 19/11/18 |
Before cob Wednesday 21st November. | PROVISIONALLY APPROVED | EPCC to attend to the issues raised and re-submit revised foundation drawings. |
6 | NG UNIVERSITIES – DOCUMENT SUBMISSION D-0027 – ROADS STUDIES & DRAWINGS (Α-4604) | 21/11/18 | 22/11/18 | Before cob on Friday 23rd November. |
APPROVED -AWKA, FUPRE, & UDUS. PROVISIONALY APPROVED – BUK. |
EPCC to attend to issues raised and re-submit for final approval |
7 | NG UNIVERSITIES – DOCUMENT SUBMISSION V-0025 – PV SUBSTATION LV PANELS DOCUMENTATION (Α-4603) | 19/11/18 | 23/11/18 | APPROVED | EPCC to submit stamped, signed and sealed hard-copies for documentation. | |
8 | NG UNIVERSITIES – DOCUMENT SUBMISSION D-0034 – FOUNDATION DRAWINGS – BUK (Α-4767) | 30/11/18 | 01/12/18 | Before cob on Monday 3rd December. | APPROVED | EPCC mandated to revise all the foundation drawings in line with the recommended 300mm and resubmit |
9 | NG UNIVERSITIES – DOCUMENT SUBMISSION D-0032 – FOUNDATION DRAWINGS – UDUS (Α-4747) | 30/11/18 | 01/12/18 | Before cob on Monday 3rd December. | APPROVED | EPCC mandated to revise all the foundation drawings in line with the recommended 300mm and resubmit |
10 | NG UNIVERSITIES – DOCUMENT SUBMISSION D-0031 – FOUNDATION DRAWINGS – FUPRE (Α-4746) | 30/11/18 | 01/12/18 | Before cob on Monday 3rd December. | APPROVED | EPCC mandated to revise all the foundation drawings in line with the recommended 300mm and resubmit |
11 | NG UNIVERSITIES – DOCUMENT SUBMISSION D-0031 – FOUNDATION DRAWINGS – FUPRE (Α-4746) | 30/11/18 | 01/12/18 | Before cob on Monday 3rd December. | APPROVED | EPCC mandated to revise all the foundation drawings in line with the recommended 300mm and resubmit |
12 | NG UNIVERSITIES – DOCUMENT SUBMISSION D-0033 – FOUNDATION DRAWINGS – AWKA (Α-4748) | 30/11/18 | 01/12/18 | Before cob on Monday 3rd December. | APPROVED | EPCC mandated to revise all the foundation drawings in line with the recommended 300mm and resubmit |
13 | NG UNIVERSITIES – DOCUMENT SUBMISSION V-0002 – VARIOUS EQUIPMENT TECHNICAL DATASHEETS (Α-3206 |
19/10/18 26/11/18 |
27/11/18 | APPROVED | ||
14 | MEETING WITH METKA ON ACCELERATED PLAN FOR PROJECT DELIVERY | 27/11/18 |
RESOLUTION / APPROVALS |
Both teams closed out on strategy to accelerate BUK, site progress, procurement and transportation, FAT status and Test Planning & Design Open points. drainage discharge, Fencing beam & Firefighting protocols. |
EPCC | STERLING & WILSON | |||||
S/N | DOCUMENTS SUBMITTED TO DATE | DATE IN | DATE OUT | DEADLINE | STATUS | REMARKS |
15 | 5-6 (MDR 140) RE: REA/EEP PROJECTS: SLD FOR GAS PLANT PROJECTS SUBMISSION. | 16/11/18 | 18/11/18 | APPROVED | Awaiting Submission of Hardcopies | |
16 | 154 (MDR 33) REA/EEP/FUNAI: MMS, BUILDINGS AND OTHER FOUNDATION STAKE POINTS/COORDINATES LAYOUT SUBMISSION. | 26/10/18 | 16/11/18 | APPROVED | Awaiting Submission of Hardcopies | |
17 | 67-70 (MDR 115, 123) REA/EEP/OAU/UNILAG: ELECTRICAL CABLES SPECIFICATIONS AND CABLE DATASHEETS FOR GAS PROJECTS SUBMISSION | 16/11/18 | 20/11/18 |
APPROVED – 11kV cable specifications PROVISIONALLY APPROVED – 11kV cable datasheet. |
Pending provision of relevant values from vendor to complete the information required in the data sheet. | |
194-199 (MDR 298, 301, & 317) REA/EEP/ATBU/FUNAI: POLES DETAILS DRAWINGS FOR PERIMETER LIGHTING, LIGHTNING PROTECTION AND STREET LIGHT SUBMISSION | 20/11/18 | 21/11/18 | Before cob on Friday 23rd November | PROVISIONALLY APPROVED | EPCC to attend to issues raised and re-submit for final approval | |
18 |
19 | 89 TO 94 (MDR 34, 19, 20, M 26, 47, & 48) REA/EEP/ATBU: CABLE SIZING, CABLE ROUTE AND EARTHING LAYOUTS SUBMISSION. | 21/11/18 | 23/11/18 | Before cob on Monday 26th November, | REVIEWED | EPCC to make all related submissions together for Review Team to close-out on all equipment and standards. |
20 | 96 TO 104 (MDR 99) REA/EEP/ATBU/FUAM/FUNAI: DATASHEETS FOR STRING COMBINER BOX (SCB) FOR SOLAR PROJECTS SUBMISSION | 19/11/18 | 22/11/18 | APPROVED | Awaiting Submission of Hardcopies | |
21 | 137 TO 142 (MDR 107) REA/EEP/ATBU/FUAM/FUNAI: VRLA BATTERY DATASHEET (TUBULAR GEL) FOR SOLAR PROJECTS SUBMISSION. | 21/11/18 | 22/11/18 | APPROVED | Awaiting Submission of Hardcopies | |
22 | 206-209 (MDR 17-19, & 22) REA/EEP/FUNAI: HT AND LT AC CABLES SIZING, FAULT LEVEL SIZING AND EARTHING PIT CALCULATIONS SUBMISSION. | 20/11/18 | 22/11/18 | Before cob on Friday 23rd November |
APPROVED – AC Cables sizing & Fault Level sizing calculations. PROVISIONALLY APPROVED – Earthing Design calculation |
EPCC to submit revised Earthing Design calculation for final approval |
23 | RE: 34 (MDR 6) REA/EEP/OAU: SITE COORDINATE AND LAYOUT PLANS FOR GAS PLANT PROJECTS SUBMISSION. | 14/11/18 | 22/11/18 | APPROVED | Awaiting Submission of Hardcopies | |
24 | RE: SWPL: 164-167 (MDR 39-40) REA/EEP/ATBU/FUNAI: STREET LIGHT CABLE ROUTING AND STREET LIGHT LAYOUTS DRAWINGS SUBMISSION. | 20/11/18 | 22/11/18 | APPROVED | Awaiting Submission of Hardcopies | |
25 | 202-205 (MDR 286, 290) REA/EEP/ATBU/FUNAI: MCR DESIGN AND FOUNDATION DESIGN CALCULATION SUBMISSION. |
20/11/18 22/11/18 |
23/11/18 | PROVISIONALLY APPROVED | Awaiting Submission of Hardcopies | |
26 | Re: FW: 89 & 123 (MDR 34 & 21) REA/EEP/ATBU: CABLE SIZING, CABLE ROUTE AND EARTHING LAYOUTS SUBMISSION. |
25/10/18 22/11/18 |
23/11/18 | REVIEWED | EPCC to make all related submissions together for close-out on all equipment and standards related to subject. |
27 | RE: 155 (MDR 179) REA/EEP/ATBU: ELECTRICAL DESIGN PHILOSOPHY DOCUMENT SUBMISSION. | 22/11/18 | 27/11/18 | PROVISIONALLY APPROVED | EPCC to revise submission paying attention to typographical and grammatical errors. | |
28 | Re: 168 & 170 (MDR 356) REA/EEP/ATBU/FUNAI: SEWAGE SEPTIC TANK LAYOUT-PLAN AND SECTIONS DRAWING FOR SOLAR PROJECT SUBMISSION. | 24/11/18 | 28/11/18 | APPROVED | Awaiting Submission of Hardcopies | |
29 | Re: 143 TO 145 (MDR 41) REA/EEP/ATBU/FUAM/FUNAI: MAIN CONTROL ROOM (MCR) ELECTRICAL EQUIPMENT LAYOUT FOR SOLAR PROJECTS SUBMISSION. | 25/11/18 | 28/11/18 | APPROVED | EPCC to incorporate see-through glass and sliding windows in the relevant sections of MCR drawings that will be submitted | |
30 | 105 TO 107 (MDR 105) REA/EEP/ATBU/FUAM/FUNAI: DIESEL GENSETS TECHNICAL DATASHEETS FOR SOLAR PROJECTS SUBMISSION. | 26/11/18 | 27/11/18 | APPROVED | Awaiting Submission of Hardcopies | |
31 | 89 TO 94 (MDR 34, 19, 20, M 26, 47, & 48) REA/EEP/ATBU: CABLE SIZING, CABLE ROUTE AND EARTHING LAYOUTS SUBMISSION | 21/11/18 | 27/11/18 | Before cob on Thursday 29th November |
APPROVED – Cable Route Layout & Cable trench Plan & Sections. PROVISIONALLY APPROVED – AC Cables sizing |
EPCC to revise cables sizing in line with comments and re-submit |
32 | 71-72 (MDR 110) REA/EEP/OAU/UNILAG: POWER SYSTEM STUDY REPORTS FOR GAS PROJECTS SUBMISSION. | 16/11/18 | 01/12/18 | APPROVED | Awaiting Submission of Hardcopies | |
33 34 |
RE: 75 & 204 (MDR 290 & 291) REA/EEP/FUNAI: MCR DESIGN AND FOUNDATION DESIGN CALCULATION SUBMISSION | 30/11/18 | 01/12/18 | Before cob on Monday 3rd December. | APPROVED | EPCC to revise the bar bending schedule in line with observation & re-submit Battery Bank Room Design separately. |
190-193 (MDR 288-288b) REA/EEP/ATBU/FUNAI: STREET LIGHT POLE AND LIGHTNING ARRESTER POLE FOUNDATIONS CALCULATIONS SUBMISSION | 27/11/18 | 01/12/18 | APPROVED | Awaiting Submission of Hardcopies |