APPLICATION GUIDELINES
All documents marked by a red asterisk* are required to submit your Solar Power Naija application.
Note:
A. DETAILED SUMMARY OF YOUR COMPANY AND PRODUCT(S)
7. Company's Ownership Structure (Local and Foreign should add up to 100%)
B. COMPANY INFORMATION (ATTACHMENTS REQUIRED IN THIS SECTION)
C. FINANCIALS
D. ADDITIONAL DETAILS
A. SOLAR HOME SYSTEMS BUSINESS PLAN INCLUDING
B. SOLAR HOME SYSTEMS TECHNICAL SPECIFIC DOCUMENTS
A. MINI-GRID SPECIFIC DOCUMENTS
Please refer to the Sections 4 (“Solar Mini-Grids”), 5 (“Solar Home Systems”) and 6 (“Solar Street Lights”) of the REA “Harmonised Technical Standards: Designs and Minimum Specifications” available online at https://rea.gov.ng/rea-harmonised-technical-standards-design-minimum-specifications/
B. MINI-GRID TECHNICAL SPECIFIC DOCUMENTS
A. MANUFACTURING: SOLAR POWER VALUE CHAIN COMPONENTS BUSINESS PLAN
A. OTHER SOLAR PROJECTS E.G. C&I, SOLAR ROOFTOP, ETC BUSINESS PLAN
B. TECHNICAL (MANUFACTURING: SOLAR POWER VALUE CHAIN COMPONENTS)
B. TECHNICAL (OTHER SOLAR PROJECTS E.G. C&I, SOLAR ROOFTOP, ETC.)
* I confirm that I have read the qualification criteria in the Solar Power Naija Program documents, and my organization or consortium meets these criteria
* I hereby confirm that the SPN can and share my profile with interested investors